Invite TCSS to Bid
MemberBICSI
On StaffRCDD Certified
CertifiedCommScope
Gold PartnerVerkada
Certified Installerdormakaba
CertifiedKeyscan
CertifiedButterfly MX
Certified InstallerHanwha Vision
CertifiedOSHA 30
Outside PlantOSP Contractor
InstalledPaging & Alert Systems
InstalledSound Masking Systems
43+ YearsCommercial Infrastructure
Completed4,500+ Projects
MemberBICSI
On StaffRCDD Certified
CertifiedCommScope
Gold PartnerVerkada
Certified Installerdormakaba
CertifiedKeyscan
CertifiedButterfly MX
Certified InstallerHanwha Vision
CertifiedOSHA 30
Outside PlantOSP Contractor
InstalledPaging & Alert Systems
InstalledSound Masking Systems
43+ YearsCommercial Infrastructure
Completed4,500+ Projects
Our Process

How a TCSS Project
Actually Runs.

From the first drawing review to the final turnover package — a clear, repeatable process built around the realities of commercial construction and the expectations of general contractors who have dealt with low-voltage subs who didn't know how to work on a real job.

01
Bid & Review

Bid Review & Scope Confirmation

We don't submit a number without understanding the job. Every bid starts with a real review of the drawings, specifications, and project requirements — not a square footage estimate and a guess.

When you upload drawings and specs to TCSS, our estimating team reviews the telecom drawings, reviews the specifications for materials and installation standards, identifies the pathway scope, confirms device counts, and reads the relevant sections of the project manual before we write a single number.

If something in the documents doesn't make sense, is incomplete, or conflicts with another trade's scope, we flag it before we bid — not after we're on the job. We submit a clear, complete bid scope with any qualifications or clarifications noted explicitly.

Full telecom drawing review before bidding

Specifications read and incorporated into bid

Scope questions submitted as RFIs before bid date

Complete bid with clearly stated inclusions and exclusions

02
Pre-Con

Pre-Construction Coordination

Before a single tool hits the jobsite, we do the work that prevents field problems — reviewing the construction schedule, walking the site if available, and coordinating with the trades whose work affects ours.

TCSS attends pre-construction and coordination meetings relevant to our scope. We review the construction schedule and identify the phases where our work needs to happen — rough-in conduit before framing is closed, cable pull after ceiling framing, device installation after drywall, rack work after the room is painted and clean.

We coordinate directly with electrical, mechanical, and other subs whose pathways conflict with ours. We confirm telecom room dimensions, power availability, and environmental conditions before we order material. If drawings have changed since bid, we review the current set and adjust accordingly.

Construction schedule reviewed and phased installation plan developed

Coordination meeting attendance — electrical, mechanical, GC

Telecom room conditions confirmed before material order

Current drawing set reviewed — any changes from bid set identified

03
Rough-In

Rough-In — Pathways & Conduit

Rough-in is where low-voltage work either sets up the installation for success or creates problems that follow the project all the way to punch list. TCSS treats rough-in with the same attention we give finished work.

Conduit is installed to spec — proper fill, proper support, proper bend radius, boxes at the right height with the right backbox for the device that goes in it. J-hooks are spaced correctly, properly supported, and installed at a consistent height that won't conflict with mechanical or electrical. Cable tray is installed level, properly supported, and with radius drops at transitions that protect the cable that will run through it later.

We don't just install conduit and leave — we make sure our rough-in is labeled (where required), that conduit stub-ups are capped and protected, and that the GC knows where our infrastructure is before the walls close around it.

Conduit installed to spec — fill, support, bend radius

J-hooks at correct height and spacing — coordinated with other trades

Backboxes at correct mounting height for device type

Stub-ups capped and protected before walls close

04
Installation

Cable Pull, Termination & Device Installation

This is where the quality of a low-voltage installation shows — and where most subs cut corners. TCSS does not.

Cable is pulled with proper tension management — no staples, no kinks, no violations of the minimum bend radius that degrades performance. Bundles are organized from the pull, not sorted out at the panel. Cable is supported every ten feet in open ceiling areas and protected at every penetration.

Terminations are made cleanly — untwisting only as much as required, consistent pair order, punch-downs fully seated. Patch panels are dressed before they're labeled, and labeled before the rack is dressed. Faceplates are installed flush, screws aligned, labeled clearly and consistently per the port schedule.

Fiber is pulled with proper grip and bend radius protection, fusion spliced at every transition point, and organized in splice trays with proper slack loops before the enclosure is closed.

Cable pulled with tension management — no kinks or bend radius violations

Terminations to TIA-568 spec — consistent, clean, fully seated

Rack dressed before labeled — organized and serviceable

Faceplates flush, screws aligned, labels per port schedule

05
Test

Testing & Certification

Every port. Every run. No exceptions. Testing is not an afterthought at TCSS — it's built into the installation schedule so we have time to address any failures before we're under pressure to turn the system over.

Structured cabling is tested with a calibrated Fluke DSX CableAnalyzer — the industry standard for Cat6 and Cat6A certification. Every port is tested channel and permanent link, and every result is stored in the tester for inclusion in the documentation package. Any failures are corrected and retested before the job is called complete.

Fiber runs are tested bi-directionally with an OTDR — generating a trace for every fiber strand that documents splice loss, connector loss, and any anomalies in the fiber path. Insertion loss testing is performed at every connection point. All results are documented in a formatted test report.

100% of ports tested — Fluke DSX calibrated tester

Cat6 and Cat6A certified to TIA-568 channel and permanent link

Fiber OTDR tested bi-directionally — all strands documented

Failures corrected and retested before turnover

06
Turnover

Turnover Package & Close-Out

The turnover package is what the building owner actually lives with. At TCSS, we treat it as part of the deliverable — not an administrative burden to finish after the job is done.

We document as we go throughout the project — maintaining a port schedule, recording conduit routing in the field, and photographing telecom room installations before closeout. By the time we reach turnover, the documentation is assembled, not created from scratch.

The TCSS turnover package includes as-built drawings showing actual cable routing and device locations, a complete port schedule mapping every outlet to its patch panel port, Fluke test reports for every copper run, OTDR test reports for every fiber strand, telecom room photographs, and any relevant product documentation. This package is what the building owner and IT team use to manage the system for the life of the building.

As-built drawings — actual routing and device locations

Complete port schedule — outlet to patch panel port map

Fluke test reports — all copper runs

OTDR reports — all fiber strands

Telecom room photographs

Product documentation and warranty information

What This Means for General Contractors

You will not be chasing TCSS.

We show up prepared

Material staged, crew briefed, drawings reviewed. We don't arrive on site to figure out what we're doing that day.

We flag problems early

If something on the drawings doesn't work in the field, you hear about it from us before it's a delay — not after.

We close out clean

Turnover documentation submitted complete and on time. No chasing test reports or as-builts weeks after we leave the job.